The survey was right about every pipe it saw
It never said which ones it hadn’t. What a contractor needs to know before the next visit, and why the fix starts with the record.
We filmed 60 percent of the risers in a 1948 building and decided to replace all of them. The 40 percent we skipped were the ones replaced in 2009. The problem was not the survey. It was that nothing in the record said where the survey had stopped.